Word from the Street

Useful answers.
For the work ahead.

Practical notes on pavement planning, treatment decisions, and evaluating software.

Buying guide / 01

Ask the software
to build a plan.

Bring a concrete planning problem. Set the treatments your team is willing to use and the budget available. Ask the software to optimize across the network, compare strategies, and show the projected effect on pavement quality.

Read the evaluation checklist
  1. Use a network with condition data you can inspect.
  2. Set an actual annual budget and planning horizon.
  3. Choose available treatments and local unit costs.
  4. Keep one committed project in the program.
  5. Ask the engine to optimize the road-by-road program across the network.
  6. Change the budget and review the treatment and timing tradeoffs.
  7. Inspect the reasoning, projected outcomes, and export.

Ask which steps are produced by the software and which require manual planning. That distinction tells you where your team’s time will go.

Planning note / 02

Why a better road
may belong in the program.

A road that is still in a suitable condition range may qualify for a preservation treatment. Waiting can change the work it needs and the cost of doing it.

Read the planning note

Planning across a network means weighing the urgent work on failed roads alongside opportunities to preserve roads that still qualify. A useful program considers both.

The treatment window matters. So do local performance, material choices, traffic, and delivery costs. Use your own evidence and engineering judgment when reviewing the recommended program.

A demonstration of preservation economics should show its assumptions. For an actual project, replace example figures with appropriate local costs and treatment expectations.

Getting started / 03

What to bring
to the first planning session.

You can begin with the records you already maintain. We work through the gaps together.

See the starting list
  • Your road network or GIS centerline file.
  • Available condition ratings and their assessment dates.
  • The annual budget and planning horizon.
  • Treatments your agency uses and recent local costs.
  • Committed projects and known delivery constraints.

You do not need to prepare these for an introductory demo. We can start on a demo network and discuss your data afterward.

Reference / 04

The language
of a pavement program.

A few terms that come up when turning road condition into work.

Open the glossary
Condition rating
A measure of pavement condition using a defined rating method. The method and assessment date matter when interpreting the number.
Treatment menu
The preservation, rehabilitation, and reconstruction options available for the program.
Unit cost
The planning cost for a defined quantity of treatment, using consistent measurement units.
Planning horizon
The number of future years included in a program.
Committed project
Work that must be included when the software builds the rest of the program.
Scenario
A program created from a particular set of budgets, treatment rules, and other assumptions.
Planning arithmetic / 05

Put your own costs
into the conversation.

Compare treatment costs across the same number of miles. This is a simple cost illustration, not a treatment recommendation or the StreetIQ optimizer.

Open the cost comparison

Starting values are illustrative figures carried from the previous mock. Replace them with appropriate local costs on a consistent centerline-mile basis. These treatments have different purposes and service lives.

Preservation$600,00020.0 miles within budget
Rehabilitation$3,700,0003.2 miles within budget
Reconstruction$14,000,0000.9 miles within budget

Total cost = miles × unit cost. Budget coverage = annual budget ÷ unit cost. The calculation does not model deterioration, treatment eligibility, life extension, or future costs.

See StreetIQ at work

Want to see the answers on screen?

Bring your questions. We’ll build a program, review the choices, and show the outputs.

Request a Demo

See StreetIQ build a program

What the demonstration shows

SCOUT captures roadway imagery and a route record. StreetIQ uses the condition data to build multi-year treatment programs against budgets and constraints. The demonstration then compares scenarios and shows the resulting maps, projected network condition, budget summary, and treatment schedule.